Sound
Hire, Design, Engineering, Equipment and Personnel
Call us on
+ 44 (0)161 969 8311
July 2014

Tour de France

Tour de France

We were delighted to be awarded the contract to supply sound design, equipment and personnel for the Tour de France Spectator Hub in Skipton. Despite atrocious weather conditions when we commenced installation at 4-00a.m. all systems were operational on time with the sun shining from late morning.

 News Page Tour de France A2

Pairs of speakers were distributed to provide music and announcements covering a 400 metre long spectator section through the town centre. In addition high power stack systems were installed for the stage entertainment and big screen with a wireless link relaying commentary to spectators on the High Street until early evening.

News Page Tour de France G2Tour de France

Sound Design: Clement Rawling
Production Engineers: David Houghton, Paul Delaney, Dan Gregory, Steve Brierley

Hire at MAC SOUND